Systems a battery plant CV may refer to
| System | Usual piping work | Ask |
|---|---|---|
| Solvent supply and recovery | Stainless or carbon steel process pipe, often welded | Which material and pipe sizes? |
| Other process chemicals | Stainless pipe or tube, sometimes plastic lines | Which joining method? |
| Compressed air and nitrogen | Utility pipe, sometimes stainless tube | Pipe or tube? Welded or fitted? |
| Cooling and chilled water | Carbon steel or stainless utility pipe | Which sizes and positions? |
| Dry room air handling | Ducts and utility connections for low-humidity rooms | Ductwork or piping? Which trade? |
| Exhaust and scrubbers | Ducts and pipe, often plastic or coated | Which materials and joining? |
How it differs from fab work
- Battery plants usually have more manual TIG and carbon steel pipe, and less small high-purity tube.
- Fab gas lines need orbital welding and very strict purity; many battery lines do not.
- Dry rooms and solvent areas have their own safety and access rules.
- Both need clean work and good weld records, but the acceptance criteria differ.
See battery plant or fab for welders and battery plant or fab for piping crews.
Questions that turn the CV into facts
- Which plant phase were you on: new build, expansion or a running plant?
- Which system and which material did you weld or install?
- Were you employed by the main contractor or a specialist subcontractor?
- Who inspected your welds, and what tests were used?