| Task | UHP piping specialist | Pipe fitter |
|---|---|---|
| Material | 316L EP/BA tube, plastic tube in some chemical lines | Carbon and stainless pipe |
| Preparation | Tube cutting and facing, cleaning; bending where the specification allows | Cutting and bevelling, fit-up |
| Joining | Face-seal and other fittings; hands tube to orbital welders | Fit-up and tack for welders |
| Drawings | Routing drawings, P&IDs, hook-up drawings | Isometrics and spool drawings |
| Clean practice | Gowning, bagging and capping, clean tools | General site rules |
| Testing | Leak, purge and purity test preparation | Pressure test preparation |
Choosing the mix
- Count tube runs and hook-ups versus pipe spools in the work packages.
- Check whether pipe spools come prefabricated or are built on site.
- Decide who routes tube in the subfab and who makes the final tool connection.
- Plan where welders and pipers work as one team, so preparation keeps up with welding.
Titles differ
Korean and overseas sites use different titles for the same work. Hire on the tasks in the table, not the title on a CV, and confirm them in the interview (screening questions).