Under ASME Section IX, a person running mechanized or automatic orbital equipment is qualified as a welding operator, while a person welding by hand is qualified as a welder. One does not cover the other. On process piping built to ASME B31.3, your company is responsible for qualifying the people who weld for you, so certificates a candidate brings from Korea are evidence of training and experience, not a substitute for your own qualification.

Two kinds of qualification

Manual TIG versus orbital under ASME Section IX (general scope; check the current edition)
Manual TIG welderOrbital welding operator
What is qualifiedThe person’s hand skill with the processThe person’s ability to set up and run the machine
Typical testCoupon welded by hand to a qualified WPS, then examinedWeld made with the equipment to a qualified WPS, then examined
Main things that limit the qualificationProcess, position, diameter and thickness ranges, filler and backingEquipment type and control method, and other variables the code lists for machine and automatic welding
Covers the other?NoNo

Codes change between editions, and the exact variables are in the standard itself. Your welding engineer or QA manager decides which tests you need; this page explains the distinction so you can read candidate documents correctly.

What Korean documents usually show

Documents a Korean candidate may bring
DocumentWhat it showsWhat it does not show
Korean national technical qualification (for example Welding Craftsman, Special Welding Craftsman, Piping Craftsman), issued by HRD KoreaThe person passed a national practical and written exam in that tradeQualification to your WPS or to ASME Section IX
Previous employer’s welder or operator qualification recordThe person passed a test to that employer’s procedure on a stated dateThat your company may use it; that it is still in continuity
Equipment manufacturer training certificateThe person completed training on a brand of orbital equipmentA code qualification
Weld logs, coupon photos, borescope imagesThe kind of work the person did and how it was recordedWho made the weld, unless the record is traceable

On a WELDK profile, staff check submitted documents against records or references and mark them as reviewed; originals are never published. WELDK does not certify welders.

How employers usually qualify a new hire

  1. Confirm the qualified WPS and the equipment the person will use.
  2. Decide whether you can accept an earlier qualification. ASME B31.3 allows acceptance of qualifications made by others only under specific conditions — your QA manager checks them.
  3. Run the test under your supervision and control, on your equipment where possible. If the person is still in Korea, see weld tests for a welder in Korea.
  4. Examine the coupon as your procedure requires and record the result with the person’s welder ID.
  5. Add any owner-specific requirements, such as start-of-shift sample welds, before production welding.

Owner specifications add their own rules

Semiconductor owners usually write their own welding specification, often referencing SEMI F78 for GTA welding practice and SEMI F81 for visual acceptance. These commonly add sample (coupon) welds at the start of a shift or after a change of equipment or material, purge oxygen limits and borescope inspection. Ask for the owner specification before you test, so the test matches what the person will do on site.

Frequently asked questions

Is a Korean Special Welding Craftsman certificate the same as an ASME qualification?

No. It is a Korean national qualification showing the person passed a national exam. It is useful evidence of training, but your company still qualifies the person to your own procedure under the code you build to.

Can we use a candidate’s qualification from a previous fab project?

Only if your code and QA system allow it and its conditions are met. Under ASME B31.3 the conditions are specific, and many owners require their own tests anyway. Your QA manager decides.

Does one qualification test cover every tube size?

Not necessarily. The sizes, thicknesses and other variables a test covers depend on the code and your WPS. Your QA manager checks the range before you assign work.