Change and what it means
| Change | New test? | What to do |
|---|---|---|
| New material (for example stainless to duplex) | Yes | Test the new material to its WPS |
| Smaller tube or thinner wall | Usually | Coupon on the new smallest size |
| Different orbital equipment | Supervised coupons | Setup check and coupons on the new equipment |
| New position or access condition | Often | Test the worst realistic position |
| New owner specification | Check | Compare acceptance criteria and sample-weld rules |
| Start date or assignment length | No | Confirm availability in writing |
| More or fewer people | No | Tell candidates who are affected |
Keeping candidates informed
Candidates in Korea often turn down other work while waiting for your decision. Tell them about changes promptly, explain whether they need to retest and when, and confirm in writing. Where your qualification rules decide, your QA manager has the last word (see qualification rules).
Avoiding late changes
- Write the requirement from the actual work packages, including the smallest sizes (writing the requirement).
- Confirm the equipment and owner specification before the search starts.
- Test the hardest case first, so later changes are less likely to need a retest.
Changes to an engagement with WELDK
If roles or headcount change after a quote, send the change in writing so the request and the quote can be updated. Terms for changes are set in the written quote for each engagement.